Surveillance complète de l'état des transformateurs : température, analyse des gaz de décharge (DGA), décharges partielles et évaluation de l'état des équipements | WhatsApp : +86 13599070393 | E-mail : [email protected]

Applications — Surveillance des transformateurs

Surveillance de l'isolation des transformateurs

Monitor developing insulation abnormalities in transformers by combining partial discharge, dissolved gas, bushing condition and relevant thermal information.

Build an insulation monitoring strategy around the transformer type, insulation structure, asset criticality and the failure mechanisms that need to be observed.

Why Transformer Insulation Condition Matters
Pourquoi est-ce important ?

Why Transformer Insulation Condition Matters

Transformer insulation is exposed to a combination of stresses throughout its service life:

  • Contrainte électrique
  • Contrainte thermique
  • Contrainte mécanique
  • Moisture
  • Aging
  • Contamination
  • Activité de décharge
  • Abnormal operating conditions

Insulation deterioration may develop gradually before a major transformer failure becomes externally visible.

No single measurement can fully describe transformer insulation health. Assessment needs to consider partial discharge activity, dissolved fault gases, bushing condition, thermal condition and operating history together — see the full picture in Surveillance des transformateurs.

Insulation Structure

What Parts of the Transformer Insulation System Should Be Considered?

  • Winding Insulation — insulation between winding conductors, turns and winding sections.
  • Main Insulation — insulation between windings, core, tank and other high-voltage structures.
  • Internal Leads and Connections — high-voltage internal connections and transition regions.
  • Douilles — the insulation interface between the transformer and the external power system.
  • Isolation en papier huilé — relevant to oil-immersed transformers, where insulating oil and cellulose insulation work together.
  • Dry-Type Solid Insulation — relevant to dry-type transformers, where solid insulation and thermal condition are especially important.

The insulation structure and relevant monitoring methods differ between transformer designs — see Surveillance des transformateurs à huile et Surveillance de la température des transformateurs à sec.

Parts of the Transformer Insulation System
Partial Discharge as an Early Insulation Warning Signal
Electrical Evidence

Partial Discharge as an Early Insulation Warning Signal

Partial discharge activity can be associated with localized insulation defects or electrical stress within high-voltage insulation structures.

  • Detect developing discharge activity
  • Observe changes over time
  • Compare abnormal trends
  • Support insulation condition assessment
  • Help prioritize further inspection

Partial discharge monitoring provides important evidence, but PD data should be interpreted together with transformer design, operating conditions and other condition information.

Chemical Evidence

Dissolved Gas Analysis for Internal Insulation Assessment

For oil-immersed transformers, changes in dissolved gases can provide chemical evidence of developing thermal or electrical abnormalities.

  • Electrical discharge
  • Surchauffe interne
  • Dégradation de l'isolation
  • Fault development trends

DGA and partial discharge monitoring observe different aspects of transformer condition and can provide complementary evidence.

Dissolved Gas Analysis for Internal Insulation Assessment
Bushing Insulation Condition Monitoring
Douilles

Bushing Insulation Condition Monitoring

Transformer bushings are critical high-voltage insulation components connecting the transformer internal electrical system to the external network.

  • Dégradation de l'isolation
  • Comportement diélectrique anormal
  • Capacitance-related changes
  • Anomalies du courant de fuite
  • Developing bushing condition changes

Bushing condition should be considered separately from internal winding insulation, because a transformer may develop a bushing problem even when other transformer indicators appear normal.

Thermal Stress

How Thermal Stress Affects Transformer Insulation

Thermal stress can accelerate insulation aging and should therefore be considered as part of a broader insulation condition assessment.

  • Persistent winding overheating
  • Local hot spots
  • Dégradation due au refroidissement
  • Charge élevée
  • Repeated thermal cycling

See Surveillance des points chauds dans les enroulements des transformateurs et Surveillance de la température des transformateurs for the direct-measurement side of thermal condition.

Combined Assessment

Why Insulation Monitoring Should Combine Multiple Signals

Condition EvidenceWhat It Can Help RevealSuivi pertinent
Partial Discharge ActivityPossible localized electrical insulation defectsSurveillance des décharges partielles
Abnormal Dissolved Gas TrendPossible developing thermal or electrical fault in oil-filled transformersDGA
Bushing Condition ChangePossible deterioration of bushing insulationSurveillance des bagues
Persistent Winding Hot SpotThermal stress that may accelerate insulation agingSurveillance de la température des enroulements
Repeated Abnormal Temperature TrendPossible cooling or thermal stress condition requiring further assessmentSurveillance de la température

The value of transformer insulation monitoring comes from correlating relevant evidence rather than relying on a single measurement.

What's the Difference

PD, DGA and Bushing Monitoring — What Is the Difference?

Surveillance des décharges partielles

Electrical discharge activity inside or around insulation structures.

DGA

Chemical evidence of developing thermal and electrical abnormalities in transformer oil.

Surveillance des bagues

Condition of critical high-voltage bushing insulation.

These monitoring methods are complementary because they observe different parts or manifestations of transformer insulation condition.

Monitoring Approach

Online Monitoring and Periodic Insulation Testing

Periodic Testing

  • Detailed scheduled inspection
  • Offline diagnostic testing
  • Maintenance verification
  • Laboratory / field testing

Online Monitoring

  • Continuous trend visibility
  • Detection of changing conditions between inspections
  • Remote supervision
  • Earlier identification of developing abnormalities

Online monitoring does not replace all periodic transformer testing. It adds continuous condition information between scheduled inspections.

Planification

Planning Insulation Monitoring for New and Existing Transformers

Nouveaux projets liés aux transformateurs

  • PD monitoring provisions
  • Embedded temperature sensing
  • Surveillance des bagues
  • DGA for oil-filled transformers
  • Monitoring architecture
  • Intégration SCADA

Monitoring points and interfaces can be considered during transformer design and commissioning.

Modernisation des transformateurs existants

  • Online PD monitoring
  • Mise à niveau DGA
  • Surveillance des bagues
  • Intégration des capteurs existants
  • Temperature monitoring integration
  • Remote data acquisition

The available monitoring configuration depends on transformer construction, existing instrumentation and accessible installation points.

Architecture

From Insulation Condition Signals to Monitoring Data

Transformer
Décharge partielle
DGA
Bushing Condition
Température
Unités de surveillance / d'acquisition de données
Communication / Passerelle
SCADA / Centre de contrôle / Surveillance à distance

See Surveillance des transformateurs for the full monitoring picture across an asset.

Informations sur le projet

What Information Helps Us Recommend an Insulation Monitoring Configuration?

Informations sur le transformateur

  • Type de transformateur
  • Puissance nominale
  • Niveau de tension
  • Age / operating history

Existing Condition Information

  • Previous PD results
  • DGA history
  • Bushing test information
  • Temperature abnormalities
  • Known insulation concerns

Monitoring Requirement

  • New project or retrofit
  • Required monitoring functions
  • Capteurs existants
  • Équipements de surveillance existants
  • Exigence relative à la surveillance à distance

Available test reports, transformer drawings or existing monitoring information can help evaluate suitable monitoring options.

Champ d'application

When Should Online Insulation Monitoring Be Considered?

Critical power transformers
Aging transformer fleet
Previous insulation abnormalities
Increasing PD activity
Abnormal DGA trends
Bushing condition concerns
High loading or thermal stress
Remote or unattended substations
Assets requiring higher condition visibility
FAQ

Foire aux questions

What does transformer insulation monitoring include?

It typically combines partial discharge, dissolved gas, bushing condition and relevant thermal information, selected according to transformer type and project requirements.

What are the main causes of transformer insulation deterioration?

Electrical stress, thermal stress, mechanical stress, moisture, aging, contamination and abnormal operating conditions can all contribute over time.

Can partial discharge monitoring detect insulation problems?

PD monitoring can help identify developing discharge activity and support insulation condition assessment, but it should be interpreted together with other condition information rather than used as a standalone diagnosis.

What is the difference between partial discharge monitoring and DGA?

PD monitoring observes electrical discharge activity directly in the insulation system, while DGA tracks fault-related gases dissolved in the transformer oil — different evidence, often used together.

Why should transformer bushings be monitored separately?

A transformer may develop a bushing problem even when other transformer indicators appear normal, so bushing condition needs its own dedicated monitoring.

How does winding temperature affect transformer insulation life?

Persistent overheating and thermal cycling can accelerate insulation aging, which is why thermal stress is considered as part of a broader insulation condition assessment.

Can PD, DGA and bushing monitoring be used together?

Yes — combining these signals is generally more informative than relying on any single measurement, since each observes a different aspect of insulation condition.

Can existing transformers be upgraded with online insulation monitoring?

Dans de nombreux cas, oui, bien que la configuration possible dépende de la conception du transformateur, de l'instrumentation existante et des points d'installation accessibles.

Does online insulation monitoring replace periodic transformer testing?

No — online monitoring adds continuous condition information between scheduled inspections, rather than replacing periodic testing.

Build an Insulation Monitoring Strategy Around the Actual Transformer Risk

Transformer insulation condition cannot be represented by a single measurement. Send us your transformer type, operating history, existing monitoring equipment and known insulation concerns to evaluate which condition signals should be monitored.

Demander un devis

Demander un devis

WhatsApp
Nous contacter

[email protected]